Reviews for "Physical Review D"

Dur. 1st rev. rnd
Tot. handling time
Imm. rejection time
Num. rev. reports
Report quality
Overall rating
Outcome
Year
16.4 weeks
21.1 weeks
n/a
1 reports
4
4
Accepted
2021
Motivation: The waiting time for a response from a potential referee was too long. In the end, another referee was contacted.
8.7 weeks
8.7 weeks
n/a
2 reports
4
4
Accepted
2014
4.3 weeks
5.3 weeks
n/a
2 reports
4
5
Accepted
2015
3.0 weeks
4.0 weeks
n/a
1 reports
4
5
Accepted
2014
3.0 weeks
3.7 weeks
n/a
1 reports
4
5
Accepted
2014
3.0 weeks
5.0 weeks
n/a
1 reports
3
4
Accepted
2012
3.0 weeks
3.0 weeks
n/a
1 reports
5
5
Accepted
2012