Dur. 1st rev. rnd
Tot. handling time
Imm. rejection time
Num. rev. reports
Report quality
Overall rating
Outcome
Year
25.9 weeks
25.9 weeks
n/a
2 reports
3
2
Rejected
2024
Motivation: The review process took too long. The paper was out for review at least two times before a final decision was reached.
14.9 weeks
22.7 weeks
n/a
2 reports
3
3
Accepted
2023
Motivation: The revision time was acceptable, but the time between the revision and the production was long; 1.5 months after the acceptance, the paper still needed to be entered into the production process.