Reviews for "Building Simulation"

Journal title Average duration Review reports
(1st review rnd.)
(click to go to journal page) 1st rev. rnd Tot. handling Im. rejection Number Quality Overall rating Outcome
Building Simulation 34.6
weeks
40.3
weeks
n/a 2 4
(very good)
2
(moderate)
Accepted
Motivation: constructive and detailed comments from the reviewers. However, the process was very long.
Building Simulation 13.0
weeks
26.0
weeks
n/a 2 5
(excellent)
4
(very good)
Accepted
Building Simulation 18.1
weeks
18.1
weeks
n/a 2 0
(very bad)
0
(very bad)
Rejected